Abstract: In this paper, we propose a discrete model of the dynamic inter-branch balance with advanced
argument, which takes into account the time lag of construction and commissioning of new capacities. General
nonnegative solution of the difference equation with advanced argument is obtained. Dual analysis of the model
based on two hypotheses (static and dynamic) of the costs’ balance of system “production - consumption " has
been provided.
Keywords: Dynamic inter-branch balance, primal and dual models
ACM Classification Keywords: H.1 Models and Principles
Link:
DYNAMIC INTER-BRANCH BALANCE WITH ADVANCED ARGUMENT (THE DISCRETE CASE)
Igor Lyashenko, Yuriy Tadeev
http://www.foibg.com/ijita/vol21/ijita21-03-p09.pdf